STRUCTURAL WORKS

    essay writing site help me write my essay
  • Road Bridge over the ring road of Saint-Pierre in Réunion, France. Construction of 3 bridges of 2 x 3 ways, one girder bridge 125 ml long with 7 bearings, two prestressed concrete bridges of 112 ml long with 4 bearings and construction of the road to connect the bridge to the existing road network.
  • Road bridge over the A26 highway nearby Arcis-sur-Aube, France.
  • Construction of a bridge with a central span of 5 ml using corbelled, prestressed segments method.

         SPORTS FACILITIES

  • Istanbul Olympic Stadium. Construction of a multipurpose Olympic stadium with 80.000 seating capacity, on a turnkey basis in Istanbul, Turkey.
  • Sports Hall of Tigery. Construction of a sports complex with several halls for different activities, including one covered swimming pool and all genres of facilities to manage the complex in Sénart en Essone, France.

         TRANSPORTATION SYSTEMS

  • Line 2 of Caracas Metro in Venezuela. Construction of 2,5 km of metro line in Caracas by traditional methods after soil injection in the riverbed under San Martin Bd.- oval tunnel section with a maximum width of 11,5 ml.
  • Line 1 of Istanbul Metro, Turkey. Realization of all accessories during the construction of the first underground metro line (Taksim-4. Levent) in Istanbul, Turkey.
  • Renovation of tunnels on Clermont-Ferrand-Nimes the railway line. Rehabilitation and enlargement of several tunnels on the railroad track, which mainly consists of the consolidation of the structure of the tunnel by adding steel frame, closing the gap between natural ground and the walls essay writing site help me write my essay of the tunnel with cement injection.Demolished the walls of the tunnel to enlarge it in order to match the European regulation and restructures the walls with shotcrete.

         GAS NETWORK

  • Istanbul gas network, Turkey. Construction of the 2.220 km of distribution line and 250.000 connections for the creation of the natural gas network in the city of Istanbul. The network was built on a turnkey basis. Gas is taken for the transportation line under 70 bars pressure at the gate of the city and distributed to the customer at 300 or 19 mbar. Steel pipes for the pressure over 25 bars and PE pipes with electrofusion coupling for pressure under 25 bars have been installed. Regulators, gas meters, cathodic protection and SCADA system have been provided.
  • Izmit Gas network, Turkey. Construction of 600 km of distribution line and 50.000 connections for the creation of the natural gas network in the city of Izmit.The network is built on a turnkey basis and the contract includes the technical and commercial management of the network during the first 3 years of operation. Steel pipes, PE pipes, regulators, gas meters, cathodic protection, SCADA system and management software have been supplied and installed.

         WATER AND SEWAGE SYSTEMS

  • Water Development of Bras de Cilaos, La Réunion, France. Construction of a different structure to collect water in the river Bras de Cilaos at the level of Cilaos, with the mountain feeding it at 25 km the plain nearby the city of Capricorne to irrigate the farmlands and distribute water to the population. The project included the construction of a dam in the river, an underground structure to separate sand and stone from the water, a circular tunnel of 7,2 km and 3 ml diameter drill with a TBM, two water tanks of 16.000 m3 each, a treatment plant of 4.000 m3/h and a network of 75 km of main distribution pipes.
  • Development of Haut du Tampon, La Réunion, France. Construction of 12 circular concrete water tanks of a capacity ranging from 800 to 3.000 m3 by spring or small river, and a distribution network to bring the water to each of the surrounding villages.

  buildings

ccna 200-125400-051810-403300-208ccna 200-125ccda 200-310400-051?200-310200-105210-260ccna 200-125ccna 200-125cisco 200-310210-260210-060ccdp 642-874ccna 200-125200-125ccna 200-125ICND1 100-105CCNP 300-075CCDP 300-320CCNA 210-260CCDP 300-101ICND2 200-105ISC CISSPCCDA 200-310CCNP 300-135CCDP 300-115CCNA 210-065CCIE 400-101CCNA 210-060CCNP 300-070
full-lace-wigs-s    |
100-virigin-remy-hair-tape-extensions-1    |
synthetic-wigs-pow    |
hair-extensions-lace    |
human-hair-extensions-sat    |
human-hair-extensions-cch    |
remy-clip-in-hair    |
human-hair-wigs-98    |
human-hair-extensions-mercy    |
human-hair-extensions-hot    |
hair-extensions-hid    |
human-hair-sister    |
hair-extensions-me    |
hair-extensions-luxy    |
brazilian-hair-onsale    |
brazilian hair   ,
lace front wigs   ,
human-hair-wigs    |
lacewigsbuy-human-hair-wigs    |
divatress-wigs-human-hair    |
platinumwigs-human-hair-wigs    |
headcovers-wigs-human-hair-wigs    |
besthairbuy-wigs    |
human hair extensions   ,
Lace Wigs   ,
Lace Front Wigs   ,
Semi-full Lace Wigs   ,
Full Lace Wigs   ,
Human Hair Wigs   ,
Human Hair Full Lace Wigs   ,
lace wigs   ,
human hair wigs   ,
human hair wigs   ,
lace front wigs   ,
human hair weave   ,
human hair wigs   ,
hair extensions   ,
human hair extensions   ,
human hair extensions   ,
human hair extensions   ,